logo
AlHaram
project cover

New Suez Industrial Bridge

Major infrastructure bridge project for industrial connectivity.
#Bridge
#Infrastructure
#Steel Truss

- Project Overview -

A 450-meter steel truss bridge connecting industrial zones across the Suez Canal corridor.

- Project Info -

Client Name:

Egyptian Ministry of Transport

Location:

Suez, Egypt

Total Area:

2,700 m²

Duration:

20 months

Year:

2023

- Client Requirements -

The government project required:

  • Heavy vehicle load rating (60 tons)
  • Navigation clearance for canal traffic
  • 50-year design life minimum
  • Minimal disruption during construction

- What We Delivered -

Our scope covered:

  • Complete steel truss superstructure
  • High-strength bolted connections
  • Corrosion protection system
  • Expansion joints and bearings

- Exterior View -

- Interior View -

- Key Results -

  • Zero canal traffic disruption
  • All load tests exceeded requirements
  • Project completed within budget

- — OUR WORKS — -

Explore More Projects

Discover how we turn complex engineering challenges into iconic structures across different sectors.

Shaping the Future with Steel.

We design, fabricate, and construct steel structures that redefine durability and performance. At AlHaram, every beam and bolt stands for reliability and excellence.